Traffic Control
Temporary traffic control plans were devised to be used during the construction of the pipeline for the following streets which were affected by the rerouting of the pipe: Cloudview Drive, Colina Alta Road, Belvidere Drive, Resler Drive, Mesa Street, and Fountain Road. Each control plan is composed of four phases, the advanced warning area, transition area, activity area, and termination area.